Current Road Work

Road Work Scheduled for 2016-2017

  • Replace pipes and base repair for Rohlers Church Road to be overlaid (Crone – Bull)
  • Replace pipes and base repair for Paradise Road to be seal coated (Davidsburg – Township line)
  • Replace pipes and base repair for Pine Hill Road to be seal coated (Bridge at WMF and G – Township line)
  • Place End Walls and Extend Pipe on Temple School Road to be Seal Coated
  • Replace rusted out pipes on Pinchtown Road (Between Paradise and Pine Hill Roads)
  • Seal Coat George Street

 Preliminary 5 Year Road PlanAs of 12/22/2015

Conewago Rd Guide Rail Conewago Rd After 04 Conewago Rd After 03 Conewago Rd After 02 Conewago Rd Milling 02 Rohlers Church Rd Guide Rail 01 Conewago Rd Milling 01 Conewago Rd After 01 Raven Ln Guide Rail Conewago Rd After 06 Rohlers Church Rd Guide Rail 02 Conewago Rd After 05

SR 074 Bridge Plans – This project is tentatively scheduled for Summer 2017 and the bridge will not be closed during construction.

 