Current Road Work

2025 Road Fabric and Paving

Dover Township accepted a Fabric and Paving bid from Stewart and Tate, Inc. The contract total is $199,946.00. This price includes mobilization, material and placement of a 9.5mm asphalt scratch/leveling course with a 2.5% cross slope, material and placement of paving fabric, material and placement of a 1.5”/2” wearing course of 9.5mm asphalt, and demobilization.

Dover Township selected three (3) areas for our 2025 road fabric and paving. The areas are as follows, Hilton Avenue from Twin Pine Ln to Carlisle Rd (Rt 74), Tower Drive from Davidsburg Rd (SR 4008) to Tiffany Dr, and Kunkles Mill Road from Bull Rd (SR-4001) to Circle Drive. This work is to be completed by August 15, 2025.

 

2025 FiberMat and Fog Sealing

Dover Township accepted a FiberMat and Fog Sealing bid from Midland Asphalt Materials Inc. The contract total is $121,649.60. This price includes mobilization, material and placement of an Asphalt Fiber Reinforced Seal with Asphalt Fog Seal, and demobilization. The sealing process is part of our pavement preservation plan; Dover Township strives to keep our good roads good by placing a seal coat and fog seal. This process helps to prevent future cracking, which allows water to enter the road surface, causing potholes to form from the freezing and thawing experienced in our region. It also helps with oxidation of asphalt by giving it a fresh black coat.

Dover Township selected the entire length of Clearview Road from Davidsburg Rd (SR-4008) to Harmony Grove Road (SR-4014). This work is to be completed by August 15, 2025.

 

2025 Stormwater Pipe Cured in Place Lining

Dover Township accepted a Stormwater Pipe Cured in Place Lining quote from a PA COSTARS contractor: Mr. Rehab, LLC. The total quote was $96,491.95. This project included mobilization, material and installation of 15”, 21”, 30”, and 48” liners.

This lining work occurred on Englewood Court, Steeple Chase Drive, and Fox Run Road.
This work was completed in June of 2025.

 

2025 Stormwater Pipe and Inlet Replacement

Dover Township accepted a Stormwater Pipe and Inlet Replacement bid from Shiloh Paving & Excavating, Inc. The contract total was $73,453.00. This project included mobilization, installation of 15”, 18”, 24”, 36”, 42” new high-density polyethylene (HDPE), installation of four (4) new precast inlets, permanent trench paving and demobilization.

There are two locations where this work has taken place. The first location is Conewago Road between Carlisle Road (SR-0074) and Oriole Lane. The second location has various areas along Blackberry Road between Carlisle Road (SR-0074) and Harmony Grove Road (SR-4014). This work is anticipated to be completed by the end of June 2025.

 


More Roads & Highway Information